Five Year Plan - Nobles County, Minnesota
 Mode:  
  Login

Five Year Plan

Nobles County, Minnesota

Quick Links

Please click the following links to quickly jump to a specific year listed on this page. To return to the top, simply click Top of Page.


Engineering Department Staff

Mark Lathen
Engineering Support Supervisor

mlathen@co.nobles.mn.us

 

Pat Thier
Engineering Technician

pthier@co.nobles.mn.us

Rocky Kolar
Engineering Technician

rkolar@co.nobles.mn.us


Nobles County Budget Online

 

 

 

Nobles County Public Works Office

Stephen P. Schnieder
Director

960 Diagonal Road
PO Box 187
Worthington, MN 56187

(507) 295-5322 (p)
(507) 372-8348 (f)

sschnieder@co.nobles.mn.us


Back to the Engineering Page

Proposed - Nobles County Five Year Plan

Listed below are the proposed construction project set by the Nobles County Board of Commissioners for the next 5 years.
 
Construction Year 2015    
Roadway Location Project Description
CSAH 39 CSAH 1 to Dundee-0.5 mile  Bituminous Overlay
CSAH 39 Dundee - 0.75 mile Reconstruction and Overlay
CSAH 1 CSAH 18 to Co. Line.-2.35 miles  Bituminous Overlay
CR 75 In Brewster - 0.37 mile  Mill and Overlay Surface
CSAH 20 1.9 miles east CSAH 19 Bridge Replacement
CSAH 15 0.8 mile north of CSAH 30 Bridge Replacement
CSAH 14 City of Brewster  
     
Construction Year 2016    
Roadway Location Project Description
CSAH 13 Iowa Line to CSAH 35 - 8.2 miles  Bituminous Overlay
CSAH 15 CSAH 13 to CSAH 4 - 3.0 miles  Bituminous Overlay 
CSAH 6 CSAH 16 to Murray Co.-6.2 miles  Bituminous Overlay
CSAH 16 TH 91 to CSAH 34 5.0 miles  Bituminous Overlay
     
Construction year 2017    
Roadway Location Project Description
CSAH 25 10 Ave to Oxford St - 0.25 mile Mill and Overlay Surface
CSAH 16 CSAH 25 to CSAH 9 - 4.0 miles  Bituminous Overlay
CSAH 7 CSAH 18 south to CSAH 18 north  Bituminous Overlay
CSAH 15 0.7 mile north of CSAH 14 Bridge Replacement
CSAH 13 0.1 mile North of CR 70 Bridge Replacement
CSAH 13 0.1 mile North of CR 69 Bridge Replacement
CR 70 0.7 mile East of CSAH 13 Bridge Replacement
CR 68 0.6 miles East of CSAH 15 Bridge Replacement
CSAH 18 CSAH 7 to TH 59  Bituminous Overlay
     
Construction year 2018    
Roadway Location Project Description
CSAH 13 CSAH 25 to Murray Co.-6.7 miles  Bituminous Overaly
CSAH 9 CSAH 2$ to CSAH 18 - 7.0 miles  Bituminous Overlay
CSAH 16 0.9 mile East of CSAH 1 Bridge Replacement
     
Construction year 2019    
Roadway Location Project Description
CSAH 13 1-90 to CSAH 25 - 8.5 miles  Bituminous Overlay
CSAH 3 CSAH 14 to CSAH 16 5.0 miles  Bituminous Overlay
CSAH 21 CSAH 3 to CR 51 south section  Reconstruction